There's nothing quite like chopping down a tree and turning it into a table. But to get to this,
You have to do a lot of this:
It helps if you convince a talented little brother to swap an old table for design work on the new:
And then it's not even sad when you have to say good-bye to the table you bought just before you got married:
We love the new table. It fits perfectly with the rest of the house and it feels like it's been here since day one. Quinn did a wonderful job for us; he considered all the other finishes, angles, and design elements in our home and designed the new table to fit with those. The colors of the wood -- mostly plum with some lighter shades of rich brown -- blend so beautifully with the finished steel. The table seats 10 comfortably and 12 in a pinch. It arrived the Wednesday before Thanksgiving, just in time to host dinner for some family members.
Tai built the wood sections (as you can see from the slideshow), and we had the metal base fabricated by a few of Quinn's contacts from school. All told, we estimate that we spent roughly 8 to 10 percent of what it would have cost us to purchase a similar piece at retail. We now have an heirloom piece of furniture with a great story and a ton of sweat equity.
We're still waiting for Quinn to pick a name for it. Suggestions welcome.
Showing posts with label designs. Show all posts
Showing posts with label designs. Show all posts
Sunday, January 8, 2012
Tuesday, September 15, 2009
Elevations
It occurs to me that many people reading this blog (are there many?) are seeing the building coming out of the ground without any idea of what it is designed to look like. In the beginning this was deliberate and then I guess I just got lazy. Since our house is quite modern and permitting was stressful and painful enough on its own, we wanted to avoid the possibility of someone trying to slow down the process for us at the city because they didn't like our design. We were actually very careful to design the house completely within the zoning requirements without any variances. This was to avoid giving anyone else any input into the design of our house. Though it would have been nice to try to get some extra height, we have seen too many examples of modern home designs seeking variances get squashed by neighbors who would seem to think a nuclear waste facility was being put in next to them.
With permit in hand and building well under way, we now unveil the elevations of our home.

East Elevation

South Elevation

West Elevation

North Elevation
I colored these myself, so the colors aren't probably very representative of what it will actually be but the silver sections are two different profiles of 12" wide galvalume siding. The light brown areas are horizontal cedar 6" tongue and groove siding and the areas that are a darker brown are bronze window and door cladding and matching metal panels.
We really love the design that Kenner and Matt came up with for us and we really love watching the Davido bring it out of the ground and make it a reality.
Tuesday, September 1, 2009
11 views on YouTube = famous!
We mentioned on Twitter recently that we had a visit from Park City TV to take a look at our current condo. We are clearly not TV stars, but we still get a kick out of seeing the finished product (and that remixed Jose Gonzalez song as the soundtrack!):
(Plus, how classic is it that Tai's first reaction was, "the SWINYARD condo??!?" Totally makes up for all those times I've been called a Biesinger, darling!)
(Plus, how classic is it that Tai's first reaction was, "the SWINYARD condo??!?" Totally makes up for all those times I've been called a Biesinger, darling!)
Friday, June 12, 2009
Itching to start
Tai is at the lot right now clearing brush from some pretty nasty overgrowth on our sideyard. If the weather cooperates, we'll be cutting down some trees tomorrow. If the weather doesn't cooperate, then we'll doing tree removal two-by-two during the evening next week.
As often happens with me these days, my earlier Tweet about applying for a building permit today isn't going to happen. For many reasons (with many people at fault), the permitting and bid sets of drawings won't be finished today in time to visit the Salt Lake City permit desk. We're hoping that visit will happen on Monday morning, which puts us about two weeks behind when we originally thought we would start the bid process (again, many people at fault).
Our current circular pinch point is that we cannot start construction until we get a full set of construction drawings from the architects. We can't get a full set of construction drawings from the architects until they are, rightfully, paid for their services. We can't pay the architects until the bank releases money from our construction loan, and the bank won't release any money until they have a detailed cost breakdown. We can't give them a detailed cost breakdown until we have completed bids from the contractor and his subs...which takes us back to the permit/bid sets of drawings that will be done by Monday morning. Stay tuned.
As often happens with me these days, my earlier Tweet about applying for a building permit today isn't going to happen. For many reasons (with many people at fault), the permitting and bid sets of drawings won't be finished today in time to visit the Salt Lake City permit desk. We're hoping that visit will happen on Monday morning, which puts us about two weeks behind when we originally thought we would start the bid process (again, many people at fault).
Our current circular pinch point is that we cannot start construction until we get a full set of construction drawings from the architects. We can't get a full set of construction drawings from the architects until they are, rightfully, paid for their services. We can't pay the architects until the bank releases money from our construction loan, and the bank won't release any money until they have a detailed cost breakdown. We can't give them a detailed cost breakdown until we have completed bids from the contractor and his subs...which takes us back to the permit/bid sets of drawings that will be done by Monday morning. Stay tuned.
Labels:
building,
construction,
designs,
financials,
permits,
the team,
yard
Thursday, June 4, 2009
Almost There
It's been a little quiet on the blog for a while, but there has been a lot going on behind the scenes. When we left off last we were working on getting some cost feedback on the design to see how we are doing relative to our budget before pushing through to finished construction docs. When we got our feedback last week, we were a bit high. So we had an emergency meeting with the architects on Friday last week to see what we could do about it. We took a look at things we could delete from the plan, things we could defer to a later time when we can better afford it. We targeted the high ticket items in the feedback and are trying to trim here and there.
Windows obviously are a high ticket item, but we didn't want to attack them or the square footage too aggressively because you can't come back later and add those in easily. We deleted a couple of windows and are seeing if there are configurations of windows that could be a little more cost effective. Right now the plan calls for metal clad wood windows. If we went to vinyl windows we could cut the cost in half or more, but we really feel like the windows need to be done right the first time.
We are doing radiant heat and that is important to us, but also important was having good air conditioning. We don't suffer the heat very well. Our original plan was to use a high velocity system with flexible 4" ducting that would be easy to hide. This number came back much higher than is feasible for us. We are going to now go with an exposed duct on the first floor that will feed floor registers on the second floor connected to a standard air conditioner and fan unit. Early feedback is that this will be much more affordable and still keep us very comfortable. The greener option would be to go with a swamp cooler, but because we are heat wimps our love for the earth could be summed up nicely by Meatloaf, "I would do anything for love, but I won't do that."
We have decided to defer the fireplace and stone countertops for now, which will also save a lot of money.
We think we have found the savings that we need and will spend the next week with the architects and engineers finishing up construction docs for delivery next week. Then we will march them into the city for permit and work on getting our formal bids tied up.
Wednesday, May 20, 2009
Quiet, but Busy
Things are a little quiet on the blog front right now. Design work is essentially complete, but before we can finalize the plans, we are getting cost feedback from the contractor to see if we are doing okay on our budget. This isn't the formal bid, but we need to know in a few key areas if we need to make changes. Since I will be putting in a bit of sweat equity into the house, this means that during this time, I am also checking out costs on items that will be my responsibility. These include the kitchen (Ikea), flooring, painting, rough electrical, base boards.
This phase is supposed to be finished early next week, after which we will decide what changes need to be made and then move towards construction docs, which, if all goes as planned in the cost estimating process, should be done on June 4th.
Monday, May 11, 2009
Finalized floor plans
You've seen crappy camera-phone photos and lots of iterations, so this might not be as exciting to you as it is to us, but here are the finalized floor plans.
First floor:
Second floor:
In each case, north is up, and the front door/street is on the right side.
We're now getting some preliminary cost feedback from our general contractor, then we'll move into construction documents over the next couple of weeks. We're still hoping to break ground sometime around July 4.
First floor:

Second floor:
In each case, north is up, and the front door/street is on the right side.We're now getting some preliminary cost feedback from our general contractor, then we'll move into construction documents over the next couple of weeks. We're still hoping to break ground sometime around July 4.
Friday, May 8, 2009
Exposure and expression
One of the things we are excited about with the design of the house is that there are going to be several exposed construction elements. We will have 2 or 3 paralam beams that are exposed to some degree and our fireplace is going to feature an exposed concrete wall that will also serve as a shear wall and of course our floors on the first floor will be the concrete slab. We really like that parts of our house will be an expression of the things that built it.




We had to reschedule our architect meeting for this afternoon, which is why this week was light on updates. We're now off to the meeting to hopefully wrap things up and enter the construction documents phase of design.
Tuesday, May 5, 2009
Priorities
Yes, that's our Eames lounge chair showing up in the elevations. The first — and, to date, only — piece of furniture included in our elevations. We are those people.

(Sorry for the horrible photo quality.)

(Sorry for the horrible photo quality.)
Friday, May 1, 2009
Vaulted space
We are tentatively expanding the vaulted space in the living room (far right of the floor plan here, the part with the "x" through it). It had been a bit pinched with all the design tweaking we did to the second floor.

If you have sharp eyes and a good memory, you'll notice a very slight shift in the placement of the second floor over the first. We're moving it to the west to create a little more vaulted space in the living room. The second-floor jog at the loft (top of the stairs) is what will require one of the structural beams in the house (it's also where we're talking about whether that beam will be exposed).
You can also see the orientation of the master bath, including a re-orientation of the toilet room, and the shower-only stall at the south (or "bottom") of the master bathroom. This particular orientation would not accommodate a double-sided linen closet, but it does reclaim a foot or so of space that we desperately needed for the second bathroom to be truly comfortable and functional. And the door for the master bedroom can be at any point along that approach hallway — as per a commentor's suggestion, we will likely put it at the public-space-end of the hall.

If you have sharp eyes and a good memory, you'll notice a very slight shift in the placement of the second floor over the first. We're moving it to the west to create a little more vaulted space in the living room. The second-floor jog at the loft (top of the stairs) is what will require one of the structural beams in the house (it's also where we're talking about whether that beam will be exposed).
You can also see the orientation of the master bath, including a re-orientation of the toilet room, and the shower-only stall at the south (or "bottom") of the master bathroom. This particular orientation would not accommodate a double-sided linen closet, but it does reclaim a foot or so of space that we desperately needed for the second bathroom to be truly comfortable and functional. And the door for the master bedroom can be at any point along that approach hallway — as per a commentor's suggestion, we will likely put it at the public-space-end of the hall.
Wednesday, April 29, 2009
Parallam
The architects and structural engineer think that we'll need a beam or three in the house to keep the fairy-tale wolves at bay. Steel beams are typically the most expensive beam option (and therefore, probably too pricey for us), so we'll look at a couple of wood options instead. Traditional old-growth timber is not a great choice if we're trying to use materials from sustainable sources, but reclaimed timber may still be an option.
Another option, which I hadn't heard about, was Parallam (and similar structural composite lumber, like Glulam), but I guess that it looks a bit like wheatboard (which I had seen, and liked):

We'd look for a source that doesn't use formaldehyde to hold it all together. If we end up using this as a beam, we might leave it exposed. Has anyone out there seen this application? Does it look good exposed? What works?
Another option, which I hadn't heard about, was Parallam (and similar structural composite lumber, like Glulam), but I guess that it looks a bit like wheatboard (which I had seen, and liked):

We'd look for a source that doesn't use formaldehyde to hold it all together. If we end up using this as a beam, we might leave it exposed. Has anyone out there seen this application? Does it look good exposed? What works?
Tuesday, April 28, 2009
Master bath update
We may be ditching the full tub in favor of a shower only. I know, I know...I said I didn't like showers only. But space has become a bigger issue than it was before, and in order to get everything else in there in a way that makes sense, we may be relying on the tub in our second bathroom instead.
Our schedule has morphed a bit as we approach the end of design. We met with Kenner, Matt and Stephanie last week for our penultimate design meeting. Our next meeting isn't until May 7, but in the meantime, the team is finishing design and starting construction documents — blurring the lines between the two phases ought to keep us on schedule for bidding and permitting during June. We'll be firing up the chainsaws for some "brush clearing" on the lot around mid-June, and we're still hoping to start construction somewhere between mid-June and early July.
Our schedule has morphed a bit as we approach the end of design. We met with Kenner, Matt and Stephanie last week for our penultimate design meeting. Our next meeting isn't until May 7, but in the meantime, the team is finishing design and starting construction documents — blurring the lines between the two phases ought to keep us on schedule for bidding and permitting during June. We'll be firing up the chainsaws for some "brush clearing" on the lot around mid-June, and we're still hoping to start construction somewhere between mid-June and early July.
Friday, April 24, 2009
Cathouse
Last night's meeting was great — we know what our floor plans will be, we have an idea of what the exterior will look like, we're all on the same page for materials, and on and on. (If you know us in real life, just ask to see the exterior elevation sketches next time we run into each other.)
A new and welcome wrinkle for us is the addition of Stephanie Kooyman from Architectural Nexus to help with our interiors. She comes to architecture by way of an interior design background and now works with Kenner and Matt at the firm. We talked last night about generally what we like for interior fixtures and finishes.
Stephanie's caveat is that no, we won't be able to afford everything we like (sad, but old, news to us!), but she can help us find similar things that will still look great in the space. She already has some interesting materials such as cork-infused bamboo and connections with suppliers that will help us understand what makes sense for our budget.
As part of that conversation, we touched on paint preference — light? dark? strong? any that we actually hate?
After a few seconds to think about it, my reponse was, "I'm not really afraid of bright colors. I would even do a bright purple, pink...whatever." Kenner: "Pink?! What is this? A cathouse??"
Kenner gets bonus points for being under 80 and using the word "cathouse." I get negative points for briefly considering a hot pink wall.
A new and welcome wrinkle for us is the addition of Stephanie Kooyman from Architectural Nexus to help with our interiors. She comes to architecture by way of an interior design background and now works with Kenner and Matt at the firm. We talked last night about generally what we like for interior fixtures and finishes.
Stephanie's caveat is that no, we won't be able to afford everything we like (sad, but old, news to us!), but she can help us find similar things that will still look great in the space. She already has some interesting materials such as cork-infused bamboo and connections with suppliers that will help us understand what makes sense for our budget.
As part of that conversation, we touched on paint preference — light? dark? strong? any that we actually hate?
After a few seconds to think about it, my reponse was, "I'm not really afraid of bright colors. I would even do a bright purple, pink...whatever." Kenner: "Pink?! What is this? A cathouse??"
Kenner gets bonus points for being under 80 and using the word "cathouse." I get negative points for briefly considering a hot pink wall.
Thursday, April 23, 2009
Batter up
It's been two weeks since our last meeting with Kenner and Matt, and we are suuuuuuuper excited for this one.
Things that we hope to learn about our house tonight:
• final floorplan (including whether the master bedroom mash-up works)
• exterior treatments (tweeted earlier this week — btw, check out the new feed on the right!)
• window placement
I feel like we've been hearing great things about this house for a while, but tonight is the first date when we finally get to meet in person.
Things that we hope to learn about our house tonight:
• final floorplan (including whether the master bedroom mash-up works)
• exterior treatments (tweeted earlier this week — btw, check out the new feed on the right!)
• window placement
I feel like we've been hearing great things about this house for a while, but tonight is the first date when we finally get to meet in person.
Tuesday, April 21, 2009
Structural Engineer
Turns out that structural engineering is a pretty important step in the process of designing a home, especially a non-traditional home, since a structural engineer essentially figures out a way for your house to not fall down. I don't really know enough to sound intelligent about it, but basically lots of things want to make your house fall down. There's gravity, live load, dead load, snow load, earthquakes, wind, and fairy tale wolves. After getting recommendations from the architects, the builder and one of my clients, we interviewed several and had them submit proposals. I found the choice to be a bit stressful because I was trying to balance several priorities, budget being a pretty big one, while still feeling confident that they could engineer to everyone's satisfaction what will end up being a pretty unique structure.
Since our house is not going to be a traditional structure we needed to make sure that the engineer understood this and was prepared to interface with the architects and brainstorm with them to figure out how to make certain of our design elements work. Since steel frames are probably out of our budget, it is important too that they figure a way for us to do this with traditional wood framing. We finally hired our engineers yesterday and they are meeting with the architects today to get going on the process. This is good, because it really was the next step before we could go much further with the design. We need to know where and how big the shear walls need to be before we can make meaningful decisions on the windows and door openings. Our hope is that after their meeting today, the architects will have a good enough idea to have those things ready for us to look at at our meeting on Thursday.
So, after architects and engineers have worked together a bit and we generally know what is possible and settle on our final design, the engineer will take the plans created thus far and figure out how to support the structure so that none of the above referenced forces can make the house fall down.
Thursday, April 16, 2009
The master bedroom mash-up
After looking at the different bedroom options, we realized that a great solution was probably going to take a bit of mix-n-match. We're not totally sure that what we want to do will actually work, but the design process has involved some dreaming for us, so why not a bit more?
This is what we'd like the master bedroom to look like — we pulled elements from three different sketches to get to this option.

If you can't read our scribbles, then the bedroom portion is from Option 3, our preferred toilet-linen combination is from Option 2, and the rest of the bathroom is from Option 4. We're not quite sure that our preferred drawing will work, hence the (2), with a slightly smaller linen closet and re-oriented toilet room.
Also, kudos to Lisa for her two-sided linen closet idea. We will henceforth call it "The Lisa." (Other naming opportunities still abound.)
This is what we'd like the master bedroom to look like — we pulled elements from three different sketches to get to this option.

If you can't read our scribbles, then the bedroom portion is from Option 3, our preferred toilet-linen combination is from Option 2, and the rest of the bathroom is from Option 4. We're not quite sure that our preferred drawing will work, hence the (2), with a slightly smaller linen closet and re-oriented toilet room.
Also, kudos to Lisa for her two-sided linen closet idea. We will henceforth call it "The Lisa." (Other naming opportunities still abound.)
Tuesday, April 14, 2009
Master bedroom layout
We've been working on laying out the master bedroom and bathroom. As it turns out, making a closet, toilet room, double vanity, shower/tub and linen closet into an 18'-by-18' grid is a bit tough. This was the first go at it:
We wanted to redesign this version because 1) we forgot a linen closet, 2) we needed a bit more living space in the bedroom part itself, and 3) it turns out that I really don't want a walk-in closet, even though I said I did. Ever the indulgent ones, Matt and Kenner sent over a few other options.
Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
In each drawing, north is "up," and the rest of the second floor is to the right of the drawing (you can see the entrance to the master suite in the same location on each drawing). We're still working on the drawings, but in the meantime, which would you choose if it were your bedroom?
We wanted to redesign this version because 1) we forgot a linen closet, 2) we needed a bit more living space in the bedroom part itself, and 3) it turns out that I really don't want a walk-in closet, even though I said I did. Ever the indulgent ones, Matt and Kenner sent over a few other options.Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
In each drawing, north is "up," and the rest of the second floor is to the right of the drawing (you can see the entrance to the master suite in the same location on each drawing). We're still working on the drawings, but in the meantime, which would you choose if it were your bedroom?
Wednesday, April 8, 2009
Green
We've been all-house-design-all-the-time here for a while that I haven't mentioned anything specifically about the "green" elements we're incorporating into this place.
Here's a quick run down of what is planned at the moment (i.e. this will probably change) and how each element could be considered sustainable, energy efficient or just plain cool:
• Radiant heating: We'll run tubing through our concrete slab on the first floor, then run heated fluid through the tubing. The heat generated is highly energy efficient (and comfortable!) because you heat the concrete, and its substantial thermal mass warms the objects in the house instead of the air. Radiant heating responds much more quickly to heating needs than heated air and maintains a constant temperature better. The fewer "warm-up" periods (equivalent to when our current furnace kicks on) save on energy costs. We'll also run radiant on our second floor — attached to the underside of the floor — for the same effect. Radiant is also a healthier option because it does not blow contaminants and particulates around the house. Plus, Tai can't wait to help lay tubing like this:
• Insulation: Framing the exterior walls with 6-inch studs will provide two additional inches of depth for wall insulation over traditional construction (the type of insulation is something we haven't decided yet, but we'd really like to do blown-in to fill all the nooks and crannies). Super insulation is a concept central to Passivhaus construction — we'll probably fall a notch or so below those European standards, but still be a great deal more than the average existing home (and even more than typical new home construction). 6-inch framing should allow us to achieve R-19 in the walls. The roof should be able to achieve R-30 just by insulating in-between the roof joists and with the foam for the membrane roofing material the final product should be around R-45 to R-50.
• Solar orientation and passive solar heating: This is a big, big reason that we were interested in an architect-designed home in the first place. Our home will take into account all the benefits and disadvantages of our site, with its strong southern orientation (not necessarily true with a stock plan bought from a builder or other outlet). We've already spent a fair bit of time talking about this in our meetings with Kenner and Matt — it's on everybody's radar.
• Low-e windows: Multiple panes, with an insulated, tight envelope construction and a low-e coating allow visible light to enter but reflect infrared radiation. In the summer this will keep much of the heat from the sun out, making it easier to maintain a comfortable temperature at lower energy consumption. In the winter, enough heat can get in to help warm the objects in the house, reducing the energy consumption required for heating.
• Ikea kitchen: We've said it before, but we'll say it again — Ikea products are among the most sustainable mass-produced stuff out there. They build their cabinets (and the million other MDF products they have) to stricter standards — no formaldahyde with lots of recycled and sustainably harvested content, such as wheatboard. The company's philosophy on product quality and safety touch on life cycle and efficiency, among other topics. Buying standard sizes of a flat-pack kitchen also means that more kitchen components can be shipped at once, lowering the per-item environmental impact. We're using easily accessible materials — not creating a custom solution that would require more waste to pull off.
• Climate-appropriate landscaping: Our initial budget will not have room for extensive landscaping, but we will have — eventually — front, side and backyards that make sense for Utah's hot, dry summers and cold winters by using native plants, drought-tolerant plants, grasses, etc.
• Energy-star appliances.
• Solar hot water heating: Budget permitting, this is something that we both really want to create. We'd run a hyper-efficient solar hot water system on the roof to take care of the bulk of our hot water needs. The sun's there, so why not use it?
• Use of renewable materials: We've had multiple love affairs with bamboo at this point (which grows very quickly), and we're interested in cork flooring as well for the second floor. Plus, I think it's gorgeous:
(Too lazy to edit their caption off...so at least now you know about the diversity of cork flooring options...)
• Low- or no-VOC paints.
• Designing in a way that makes good sense. This is harder to quantify, but it involves things like not over-sizing rooms, not over-sizing the house, etc. It also means adding a mud room for backyard entry from the detached garage and an entry vestibule for the front that will let us take off our shoes before coming inside so that we don't track outside muck/particulates all over the house, etc.
What don't you see on this list? A lot of gadgets and things like solar panels. Solar panels are still just too expensive for us. They require a substantial investment up front, which then takes a long time to recoup in saved energy costs, and this isn't the house we plan on living in for the rest of our lives. We hope that the price of solar systems will keep dropping and the technology will keep improving. Also, you won't hear us crowing about our righteous use of ceiling fans and swamp coolers — because we're getting an air conditioner. It will be a small and efficient one, but getting an efficient AC unit is sort of like getting an efficient dryer — you're sunk just by definition. (And we're owning up to it.)
We are trying to make logical building decisions that are efficient and sustainable, and we aren't interested in "green-washing" the project. We just don't have the budget to make it super outwardly "green" or "eco." But it is going to be a smart, responsible and efficient house.
Here's a quick run down of what is planned at the moment (i.e. this will probably change) and how each element could be considered sustainable, energy efficient or just plain cool:
• Radiant heating: We'll run tubing through our concrete slab on the first floor, then run heated fluid through the tubing. The heat generated is highly energy efficient (and comfortable!) because you heat the concrete, and its substantial thermal mass warms the objects in the house instead of the air. Radiant heating responds much more quickly to heating needs than heated air and maintains a constant temperature better. The fewer "warm-up" periods (equivalent to when our current furnace kicks on) save on energy costs. We'll also run radiant on our second floor — attached to the underside of the floor — for the same effect. Radiant is also a healthier option because it does not blow contaminants and particulates around the house. Plus, Tai can't wait to help lay tubing like this:
• Insulation: Framing the exterior walls with 6-inch studs will provide two additional inches of depth for wall insulation over traditional construction (the type of insulation is something we haven't decided yet, but we'd really like to do blown-in to fill all the nooks and crannies). Super insulation is a concept central to Passivhaus construction — we'll probably fall a notch or so below those European standards, but still be a great deal more than the average existing home (and even more than typical new home construction). 6-inch framing should allow us to achieve R-19 in the walls. The roof should be able to achieve R-30 just by insulating in-between the roof joists and with the foam for the membrane roofing material the final product should be around R-45 to R-50.
• Solar orientation and passive solar heating: This is a big, big reason that we were interested in an architect-designed home in the first place. Our home will take into account all the benefits and disadvantages of our site, with its strong southern orientation (not necessarily true with a stock plan bought from a builder or other outlet). We've already spent a fair bit of time talking about this in our meetings with Kenner and Matt — it's on everybody's radar.
• Low-e windows: Multiple panes, with an insulated, tight envelope construction and a low-e coating allow visible light to enter but reflect infrared radiation. In the summer this will keep much of the heat from the sun out, making it easier to maintain a comfortable temperature at lower energy consumption. In the winter, enough heat can get in to help warm the objects in the house, reducing the energy consumption required for heating.
• Ikea kitchen: We've said it before, but we'll say it again — Ikea products are among the most sustainable mass-produced stuff out there. They build their cabinets (and the million other MDF products they have) to stricter standards — no formaldahyde with lots of recycled and sustainably harvested content, such as wheatboard. The company's philosophy on product quality and safety touch on life cycle and efficiency, among other topics. Buying standard sizes of a flat-pack kitchen also means that more kitchen components can be shipped at once, lowering the per-item environmental impact. We're using easily accessible materials — not creating a custom solution that would require more waste to pull off.
• Climate-appropriate landscaping: Our initial budget will not have room for extensive landscaping, but we will have — eventually — front, side and backyards that make sense for Utah's hot, dry summers and cold winters by using native plants, drought-tolerant plants, grasses, etc.
• Energy-star appliances.
• Solar hot water heating: Budget permitting, this is something that we both really want to create. We'd run a hyper-efficient solar hot water system on the roof to take care of the bulk of our hot water needs. The sun's there, so why not use it?
• Use of renewable materials: We've had multiple love affairs with bamboo at this point (which grows very quickly), and we're interested in cork flooring as well for the second floor. Plus, I think it's gorgeous:
(Too lazy to edit their caption off...so at least now you know about the diversity of cork flooring options...)• Low- or no-VOC paints.
• Designing in a way that makes good sense. This is harder to quantify, but it involves things like not over-sizing rooms, not over-sizing the house, etc. It also means adding a mud room for backyard entry from the detached garage and an entry vestibule for the front that will let us take off our shoes before coming inside so that we don't track outside muck/particulates all over the house, etc.
What don't you see on this list? A lot of gadgets and things like solar panels. Solar panels are still just too expensive for us. They require a substantial investment up front, which then takes a long time to recoup in saved energy costs, and this isn't the house we plan on living in for the rest of our lives. We hope that the price of solar systems will keep dropping and the technology will keep improving. Also, you won't hear us crowing about our righteous use of ceiling fans and swamp coolers — because we're getting an air conditioner. It will be a small and efficient one, but getting an efficient AC unit is sort of like getting an efficient dryer — you're sunk just by definition. (And we're owning up to it.)
We are trying to make logical building decisions that are efficient and sustainable, and we aren't interested in "green-washing" the project. We just don't have the budget to make it super outwardly "green" or "eco." But it is going to be a smart, responsible and efficient house.
Tuesday, April 7, 2009
More Thoughts on Basements (From Tai)
Another reason that was key in our decision to forgo the basement had to do with marketability and appraisal of the final product. At first glance we thought that for marketability a basement would be necessary, but looking at it closely it proved otherwise.
Most of the homes in the neighborhood are about 1,500 to 2,000 square feet total, with half of that footage being in the basement. We will be building approximately 2,000 square feet on two levels above ground, so the quality of our 2,000 square feet should be much nicer than neighbors. But if we were to try to have a basement we would end up with a home that is closer to 3,000 square feet. Even if you figure that you can get half as much value out of the basement as you can upstairs, that would put us in a house that costs 30% to 50% more than neighboring houses, which is definitely a tough sell on an appraisal and could prove difficult in the eventual resale of the house when we are through living in it.
This was verified by the bank when we were getting our financing. They told us that they just couldn't get appraised value out of the basement and it would make the whole financing package that much less desirable to the bank.
So, yes, a basement would make good room for future expansion of the house, but expanding the house to that size would make the house too big for the neighborhood. Plus, like Kersten said, we should see significant savings in construction costs by avoiding the costs for trusses on the first floor, subflooring and finish flooring. Our slab will be all of those things. A slab will also give us really good thermal mass and greater efficiency for our radiant heat system, and perhaps most importantly, a slab will allow us to fit under the 20 foot height required for flat roofs by zoning and still have good ceiling heights.
Most of the homes in the neighborhood are about 1,500 to 2,000 square feet total, with half of that footage being in the basement. We will be building approximately 2,000 square feet on two levels above ground, so the quality of our 2,000 square feet should be much nicer than neighbors. But if we were to try to have a basement we would end up with a home that is closer to 3,000 square feet. Even if you figure that you can get half as much value out of the basement as you can upstairs, that would put us in a house that costs 30% to 50% more than neighboring houses, which is definitely a tough sell on an appraisal and could prove difficult in the eventual resale of the house when we are through living in it.
This was verified by the bank when we were getting our financing. They told us that they just couldn't get appraised value out of the basement and it would make the whole financing package that much less desirable to the bank.
So, yes, a basement would make good room for future expansion of the house, but expanding the house to that size would make the house too big for the neighborhood. Plus, like Kersten said, we should see significant savings in construction costs by avoiding the costs for trusses on the first floor, subflooring and finish flooring. Our slab will be all of those things. A slab will also give us really good thermal mass and greater efficiency for our radiant heat system, and perhaps most importantly, a slab will allow us to fit under the 20 foot height required for flat roofs by zoning and still have good ceiling heights.
Monday, April 6, 2009
The 96/4 rule
This Thursday's meeting with Kenner and Matt will be about, among other things, some exterior treatments for the house. We're excited to see what they present because while we're all roughly on the same page, Tai and I still have slightly different ideas of what we'd like to see on the facade. I prefer a cooler, almost industrial look — primarily concrete and metal with small accents of warmer materials such as wood. Tai leans toward warmer materials — primarily woods, with accents of the cooler materials. (Incidentally, we think that Tai's approach would be more likely to pacify neighbors than mine would...which, of course, goes right back to the differences in our personalities.)
At any rate, one of the larger differences between the two of us is our opinions of stucco. Tai's not opposed. I adhere to a 96/4 division: I hate it 96 percent of the time, but I might not totally hate it the other 4 percent of the time. This is my quasi-liberal side coming out — I don't want to totally discriminate against stucco, so I'll keep an "open" mind to allow for uses that I haven't seen...or that might not actually exist...
The 96 percent (and all similar ilk):

Maybe this can be part of the 4 percent?:

I have such an aversion to its use, though, that I'm still undecided...
Is this normal?
At any rate, one of the larger differences between the two of us is our opinions of stucco. Tai's not opposed. I adhere to a 96/4 division: I hate it 96 percent of the time, but I might not totally hate it the other 4 percent of the time. This is my quasi-liberal side coming out — I don't want to totally discriminate against stucco, so I'll keep an "open" mind to allow for uses that I haven't seen...or that might not actually exist...
The 96 percent (and all similar ilk):

Maybe this can be part of the 4 percent?:

I have such an aversion to its use, though, that I'm still undecided...
Is this normal?

