    Update

    It's been quite a while since I posted any pictures. Since the last posting the framing has been finished up, the roof has gone on, the rough plumbing has been finished and inspected, the rough electrical has been completed, the gas line installed, the house has been wrapped in Tyvek and the windows have been installed. Tomorrow insulation starts and should be done by Thursday. Turns out that Davido was able to negotiate blown-in insulation which will give us R-23 in the walls instead of the R-19 blanket we originally had bid.

    Here are a bunch of pictures of the last week or so.