Pages

    Thursday, August 20, 2009

    Framing Day 2

    Another productive day of framing today. We got the bulk of our south wall up as well as the shear wall on the front. 



    We also got 3 posts in on the corners of the double high walls and set the beam over the patio opening on the south side. The beam is a 5 1/4 inch wide by 18 inch deep over a 12 foot opening. Needless to say it was really really heavy. Fortunately Nick the concrete guy and Jared the excavator stopped by and with their help we were able to rig it to the bob-cat and transport and lift the beam in place. Thanks guys.


    No comments: