    After the sheetrock was done, things on the inside were turned over to me for the most part. Originally we had planned on doing all the painting ourselves. I hadn't really thought through sealing the windows and doors and after looking into a few products we determined that it would be best to have them spray lacquered. We had a couple of painters that Davido has worked with give us a bid on it. Dave Miller and Dave Burleigh at Allstar Painting gave us such a good bid for that that we decided to also have them spray the primer and a finish coat of white on all the walls and ceilings as well. This saved us a ton of time. In the course of one week we had all the doors and windows sealed and all the walls painted. We still have some walls that we will paint an accent color on but I can't tell you how relieving it was to have the paint 90% done in one week. The painters were great to work with and let me do some of the prep to help keep costs down. They also did an absolutely great job. The combination of a really good paint job with an excellent sheet rock job make the walls look like a million bucks.

    We went with a Kwal-Howell product called Envirocoat which is a no-voc paint and it turned out to be a really great product. The walls were given an eggshell sheen and the ceiling got a flat paint. With so much ceiling and no texture anywhere, a flat paint up there will keep light from glaring and make any irregularities in the ceiling less noticeable.

    Between helping us prep for paint, Davido and his guys finished up the cedar siding. It looks really great. The mitered corners are a really nice touch. We just hope that they don't shrink up too much. Each board has two coats of sealer on all sides and all cut edges were sealed and all joints were glued, so we think it will do okay.

    The painting was done last Friday around noon and as soon as they were done I got working on the tile work. Friday and Saturday morning I got the backer board down and then Saturday afternoon Kersten showed up and helped me start laying the tile down in the bathrooms and laundry room. She was actually really good at it. She's really a good baker and she said that spreading the mortar reminded her a lot of frosting a cake. Saturday we got all the laundry and second bathroom and about half of the master bathroom finished. I was back at it Monday night after work and finished the master bathroom. Then Tuesday night and Wednesday night my Dad came and helped me get the walls around the bath tub in the second bathroom finished. He was a huge help and once we settled on a plan of attack we were able to move pretty quickly. Friday I spent figuring out the rest of the shower pan for the master bathroom shower. Our plumber did the base slope and water proof membrane which had to be inspected by the city a couple of weeks ago but it still needed a mortar layer over top of the membrane for the tile to go on. I used a sand/portland cement mixture that goes in as a dry-pack application. Enough water is added so that it feels a bit like wet sand. It was pretty tedious getting the perimeter edges level and then sloping it towards the drain, but it's done now and I'll start working on the tile for the floor in the shower next.

    We went with a 2x2 inch tile mosaic on the floor by American Olean in Ice White with a matte finish. The walls are 3x6 subway tile in the same finish.

    Wednesday we got most of our finish electrical work done and even got some lights working. This makes working at night so much easier. We are just waiting for all of our accent lighting to come in and that will be installed. We've got some cool fixtures that we are excited about. Thursday they started installing the ductwork for our air conditioning system. We have radiant heat but really hate the heat, so we are going to have an exposed spiral duct running down the hallway on the first floor that will have registers to cool the first floor and trunks that feed registers in the floor for the up-stairs. We also put an exposed duct in the hallway upstairs to pull all the hot air that will gather at the top of the vaulted space out of the house and cool the house more efficiently. They should be all done on Monday.

    7 comments:

    becky said...

    i know i never comment but i love the updates! everything is looking so awesome. i cannot wait to see the finished product!

    alyce said...

    It is mind-boggling how far you've come in so little time. It feels like yesterday that I was popping in daily to see if you'd gotten your permits, and now you're tiling floors. Incredible!

    Bring on the updates.

    SteveK said...

    You hate the heat? Most people love radiant heat. What kind of system do you have and was it sized and installed by a professional?

    Tai said...

    What I intended to day was that we hate summer time heat so we installed air conditioning in addition to the radiant heat. It actually hasn't been fired up yet but we are really excited about radiant heat.

    SteveK said...

    Phew! Thanks for the clarification! :-)

    Anonymous said...

    Come on Tai give us our fix...

    mushbelly said...

    I'm so jealous that you had your doors / windows and walls professionally sprayed! We still have not finished all of the window trim in our house. Your house is looking so awesome! I can't wait to see the rest of the exterior material go up

    Michelle
    (Lucy Ave)